📞 +60172060078 ✉️ sales@masterintelligent.com

The total number of cargo positions is 26,688 pallets, and a total of 8 pallet stackers are configured

Customer preview

  • The overall automated three-dimensional cold storage meets the storage and warehousing capacity of various quick-frozen products with a total of 290 pallets per hour; the three-dimensional warehouse and the production workshop are connected by a conveyor line, and the materials on each floor of the workshop are transported to the mezzanine on the first floor by a hoist for warehousing operations.
Project Background
  • A total of 26,688 cargo positions
  • Handling process: automatic palletizing line/manual palletizing → silo hoist.
Solution
  • Products: 8 pallet stackers
  • System configuration: WMS warehouse management system, intelligent and automated hardware-software full process
  • Solved the problems of low automation of material storage and insufficient space utilization.
Systems and Equipment to Discover
Project Difficulties
  • Cooperative docking: Conveyor lines and elevators need to be coordinated and docked, and labor efficiency is low.
  • Cost investment: three shifts, repeated ineffective operations, and costs are rising year by year.
  • Flexible logistics: The site space is compact and does not support secondary transformation of the site environment.
  • Operation efficiency: There is no warehouse information management on site, and the efficiency of picking up and finding goods is slow.
Project Value
  • Increase storage capacity by 4.5 times
  • Increases efficiency by 10%
  • Increases timeliness by 8%
  • Precise docking
  • All-round security




Related Logistics Equipments



Automated Logistics System Solutions

RGV System

Automated Vertical Warehouse Solution

Warehouse Control System

Dense Storage Solution (Four-way Shuttle)

Multilayer Shuttle System

Shuttle & Carrier Dense Storage Solution

Multilayer Shuttle System

Pallet Shuttle Dense Storage Solution (Material Box)